A wall arrives on site as one panel. On the drawing it stands in for several separate trades.

Two galvanised mesh faces, diagonal connectors, EPS in between. Concrete on both faces once it is standing. Structure, insulation and substrate stop arriving on three different days.

Xpanel builds three times faster than conventional systems. Most of that gap opens in the queue that no longer forms: one trade waiting for the previous one to finish, the calendar absorbing the wait, and nobody pricing that wait as a line item.