The cost of building is not going back down. The margin has moved to the method. Material prices sit at record levels and a structural labour shortage is tightening every timeline. When the inputs rise and stay high, margin is no longer protected at the land purchase — it is protected in how you build.

Traditional construction treats time, labour and waste as fixed. An industrialized structural system treats them as variables you can plan for: one continuous structure, fewer trades, less on-site improvisation.
The question is no longer whether industrialized building is coming. It is how much margin you keep by adopting it before it becomes the standard.