In La Oliva, Fuerteventura, a 120 m² single-family home is going up with the Xpanel system built with our partner Real Sustainable Walls.
No render. Real concrete, real site, real structure. This is industrialized construction once it leaves the brochure and meets the ground: engineered before it reaches the site, so the build runs faster and leaner on this home, by our estimate, around two months ahead of a conventional
build. One home today. The method behind many more tomorrow.

Xpanel IndustrializedConstruction Fuerteventura

Privacy Preference Center