𝗨𝗻𝗹𝗲𝗮𝘀𝗵 𝘁𝗵𝗲 𝗦𝘁𝗼𝗿𝗺. 𝗟𝗲𝗮𝗱 𝘁𝗵𝗲 𝗥𝗲𝘃𝗼𝗹𝘂𝘁𝗶𝗼𝗻. 𝗕𝗲 𝗨𝗻𝘀𝘁𝗼𝗽𝗽𝗮𝗯𝗹𝗲.

The latest machinery from X8 is set to dominate the SCIP worldwide market, producing the highly advanced Xpanel Tech.

2024 marks a milestone in the development of new building technologies. IMZ Holding has given the green light for the new 𝗗𝘂𝗯𝗮𝗶 𝗫𝟴 𝗔𝗱𝘃𝗮𝗻𝗰𝗲 𝗠𝗮𝗰𝗵𝗶𝗻𝗲𝗿𝘆 𝗣𝗿𝗼𝗱𝘂𝗰𝘁𝗶𝗼𝗻 𝗖𝗲𝗻𝘁𝗲𝗿. This factory is the first of four we will inaugurate over the next 18 months, increasing our production capacity of X8 machinery lines to 4 per month—the largest production capacity installed worldwide, surpassing the rest of the world combined.

The new X8 factory will be inaugurated on June 8, 2024, and will deliver the first lines of the new X8 2.0 in July 2024.

𝗧𝗲𝗰𝗵𝗻𝗶𝗰𝗮𝗹 𝗛𝗶𝗴𝗵𝗹𝗶𝗴𝗵𝘁𝘀:

Production Capacity: 18 X8 2.0 lines per year
Future Development: Starting in summer 2025, the factory will produce the new X8 PLUS, our newest fully robotic lines of machinery currently under development, poised to revolutionize the industry alongside Xpanel.

𝗨𝗽𝗰𝗼𝗺𝗶𝗻𝗴 𝗙𝗮𝗰𝘁𝗼𝗿𝘆 𝗔𝗰𝘁𝗶𝘃𝗮𝘁𝗶𝗼𝗻𝘀 𝗪𝗼𝗿𝗹𝗱𝘄𝗶𝗱𝗲:

June 2024: Dubai
January 2025: Riyadh (KSA)
March 2025: Florida (USA)
September 2025: Malaga (Spain)

Privacy Preference Center